Trinity Landing Construction is Under Way
Welcome to Trinity Landing!
Refreshing salt air and a fun, enriching life will soon greet you at beautiful Trinity Landing, to be located right on the Intracoastal Waterway, and set to open in 2022. Here, you’ll discover resort-like coastal living at its best—and unlike any other community in the Wilmington area. You’ll revel in days full of gorgeous views, exciting amenities, new friends, thoughtful services, vibrant programming, and the ease of maintenance-free living. Best of all, you can relax knowing that you have the perfect lifelong retirement plan in place should your needs change in the future.
Coastal-inspired Residences
Exceptional Amenities
Plan Your Waterfront Retirement!
Blog, News and Events
The Excitement Builds As Trinity Landing Depositors Prepare To Move In
Fate? Kismet? That’s certainly how Bob and Wendy Inman look at the series of events that led to them becoming depositors at Trinity Landing. Other words that might be used to describe the Inmans feelings about their upcoming move are excitement, anticipation and...
Trinity Landing Construction is Under Way
At Trinity Landing—set to open in 2022 on the Intracoastal Waterway—you’ll find it easy to leave the work and worry of home ownership behind! You’ll enjoy choosing your dream coastal residence from a beautiful selection of floor plans thoughtfully designed for entertaining friends and family—or just relaxing in style. We take care of all the work. You get more time for fun.
-
August 2020
August 2020
With site work completed in July, we were ready to go vertical in August, kicking off construction and allowing the vision of Trinity Landing to truly come to life! In our first month of construction, we made so much progress with underground plumbing and electrical for the Town Center and the villas all within the first two weeks.
August 2020
With site work completed in July, we were ready to go vertical in August, kicking off construction and allowing the vision of Trinity Landing to truly come to life! In our first month of construction, we made so much progress with underground plumbing and electrical for the Town Center and the villas all within the first two weeks.
-
November 2020
November 2020
In November, Trinity Landing celebrated all the progress we’ve made thus far with a “Blessing of the Land” construction celebration alongside our project partners and future residents. Also in November, the first of our residential windows arrived and were installed, the garage walls of our villa residences started going up, and the cupola and roofing were installed for our restaurants.
November 2020
In November, Trinity Landing celebrated all the progress we’ve made thus far with a “Blessing of the Land” construction celebration alongside our project partners and future residents. Also in November, the first of our residential windows arrived and were installed, the garage walls of our villa residences started going up, and the cupola and roofing were installed for our restaurants.
-
February 2021
February 2021
Residence buildings started coming together with the fiber cement lap and fiber cement shake siding beginning in early February, adding even more coastal charm! Solar panel installation began on our Town Center which will help to power 124 apartments, as well as our community restaurants and amenity spaces. Water lines, underwater lights and skimmers for the pool and hot tub were all installed as a major milestone towards the Saltwater Aquatic Center.
February 2021
Residence buildings started coming together with the fiber cement lap and fiber cement shake siding beginning in early February, adding even more coastal charm! Solar panel installation began on our Town Center which will help to power 124 apartments, as well as our community restaurants and amenity spaces. Water lines, underwater lights and skimmers for the pool and hot tub were all installed as a major milestone towards the Saltwater Aquatic Center.
-
May 2021
May 2021
As Trinity Landing truly starts to take shape, construction continued on with building out the Town Center restaurants and dining courtyard - we even had a Pizza oven installed! The Saltwater Wellness Aquatic Center is coming along nicely with the hot tub laid out and exterior walls installed this month. We continued working on the exciting vision of the boardwalk and bridge leading out to the Intracoastal Waterway which will also include a pier, kayak launches, gazebo and boat lifts!
May 2021
As Trinity Landing truly starts to take shape, construction continued on with building out the Town Center restaurants and dining courtyard - we even had a Pizza oven installed! The Saltwater Wellness Aquatic Center is coming along nicely with the hot tub laid out and exterior walls installed this month. We continued working on the exciting vision of the boardwalk and bridge leading out to the Intracoastal Waterway which will also include a pier, kayak launches, gazebo and boat lifts!
-
August 2021
August 2021
August was another great month of construction as we move closer to our May 2022 opening date. We cannot wait for you to be able to take a morning walk on the boardwalk and see the breathtaking views for yourself. Our community is coming together, and we are so excited for you to join us. And if you previously missed out on your preferred choice of one of our beautiful Villas, we’ve got good news! We are adding 24 additional Villas early, set to be ready when we open our doors in May.
August 2021
August was another great month of construction as we move closer to our May 2022 opening date. We cannot wait for you to be able to take a morning walk on the boardwalk and see the breathtaking views for yourself. Our community is coming together, and we are so excited for you to join us. And if you previously missed out on your preferred choice of one of our beautiful Villas, we’ve got good news! We are adding 24 additional Villas early, set to be ready when we open our doors in May.
-
November 2021
November 2021
November was another great month of progress at Trinity Landing as our wonderful community on the Intracoastal Waterway is one month closer to completion. The Lumina waterfront pavilion is almost finished and ready for you to enjoy a beautiful sunrise. We cannot wait for you to join us in May 2022!
November 2021
November was another great month of progress at Trinity Landing as our wonderful community on the Intracoastal Waterway is one month closer to completion. The Lumina waterfront pavilion is almost finished and ready for you to enjoy a beautiful sunrise. We cannot wait for you to join us in May 2022!
-
February 2022
February 2021
Residence buildings started coming together with the fiber cement lap and fiber cement shake siding beginning in early February, adding even more coastal charm! Solar panel installation began on our Town Center which will help to power 124 apartments, as well as our community restaurants and amenity spaces. Water lines, underwater lights and skimmers for the pool and hot tub were all installed as a major milestone towards the Saltwater Aquatic Center.
February 2022
Our front entrance is eager to greet our new residents as we push through February’s construction progress. The cold didn’t bother us as we’re prepping several wonderful outdoor spaces for you here at Trinity Landing. Check out these pictures of the Saltwater Wellness Center, restaurant and dining courtyards, and fireplaces that are ready to warm you up on a cool Carolina night. Other progress is being made throughout the community as the interior of the Cypress is taking shape, and the golf cart and bicycle pavilion is almost complete.
-
May 2022
May 2022
As you can see from these photos, construction is almost nearing completion! In May we worked on wrapping up the finishing touches on the interiors in our dining and wellness areas. Be sure to also take a look at the beautiful interior work being done in our Villas. The dining courtyard is now ready and will be the perfect spot for you to enjoy a delicious meal while enjoying the beautiful weather here on the Intracoastal Waterway. Also, we are so excited to introduce you to one of our favorite up and coming activities, Pickleball, as the courts were just installed this month. We cannot wait to have you join our family on the waterfront at Trinity Landing!
May 2022
As you can see from these photos, construction is almost nearing completion! In May we worked on wrapping up the finishing touches on the interiors in our dining and wellness areas. Be sure to also take a look at the beautiful interior work being done in our Villas. The dining courtyard is now ready and will be the perfect spot for you to enjoy a delicious meal while enjoying the beautiful weather here on the Intracoastal Waterway. Also, we are so excited to introduce you to one of our favorite up and coming activities, Pickleball, as the courts were just installed this month. We cannot wait to have you join our family on the waterfront at Trinity Landing!
-
August 2022
August 2022
Phase one of our waterfront community is receiving the finishing touches. The aquatic center and spa are ready for you to enjoy a nice swim and relaxing massage. Afterwards, have a beer with your new neighbors at the sunken bar in the Portside Pub. Then end the day with the amazing view from the Lumina Waterfront Pavilion. We can’t wait for you to join us and be able to see Town Center lit up at night!
August 2022
Phase one of our waterfront community is receiving the finishing touches. The aquatic center and spa are ready for you to enjoy a nice swim and relaxing massage. Afterwards, have a beer with your new neighbors at the sunken bar in the Portside Pub. Then end the day with the amazing view from the Lumina Waterfront Pavilion. We can’t wait for you to join us and be able to see Town Center lit up at night!
-
September 2020
September 2020
In September we completed the concrete slabs for the Marker 1398 restaurant, The Jetty Private Dining Room, Oyster Bay Café, The Low Tide Pub, the kitchen area of our restaurants, the Chart House Library, the Seascape Spa, the Rusty Anchor Club Room, Driftwood Art Studio and the Live Oak Auditorium – all of which were a major milestone for allowing continued progress on the foundational elements of the Town Center.
September 2020
In September we completed the concrete slabs for the Marker 1398 restaurant, The Jetty Private Dining Room, Oyster Bay Café, The Low Tide Pub, the kitchen area of our restaurants, the Chart House Library, the Seascape Spa, the Rusty Anchor Club Room, Driftwood Art Studio and the Live Oak Auditorium – all of which were a major milestone for allowing continued progress on the foundational elements of the Town Center.
-
December 2020
December 2020
The popular villa residences made major progress in December. We began framing on the front entrance and C-Wing of the Town Center, along with continued framing progress of the second and third floors of the B-Wing and D-Wing. Additionally, the exterior walls went up to shape the Aquatic Center and site work was laid out for our boardwalks and bridges to connect our islands and mainland.
December 2020
The popular villa residences made major progress in December. We began framing on the front entrance and C-Wing of the Town Center, along with continued framing progress of the second and third floors of the B-Wing and D-Wing. Additionally, the exterior walls went up to shape the Aquatic Center and site work was laid out for our boardwalks and bridges to connect our islands and mainland.
-
March 2021
March 2021
The Town Center continued to see cosmetic progress with “Foggy Day” and “Arctic White” paint added to the west side elevation and balconies were added to the south side of the Town Center. We were even able to have some of our future residents join us to tour their chosen residences and envision themselves in their new space that they will soon call home!
March 2021
The Town Center continued to see cosmetic progress with “Foggy Day” and “Arctic White” paint added to the west side elevation and balconies were added to the south side of the Town Center. We were even able to have some of our future residents join us to tour their chosen residences and envision themselves in their new space that they will soon call home!
-
June 2021
June 2021
June was another month full of progress, particularly as we started focusing on some of the interior spaces of our buildings. The walking trails, boardwalk and bridge have all seen incredible progress as well with boards leading out to our community's beautiful water scenery along the Intracoastal Waterway. The Saltwater Wellness Aquatic Center added eye-catching curved poolside walls, adding unique character to the design elements.
June 2021
June was another month full of progress, particularly as we started focusing on some of the interior spaces of our buildings. The walking trails, boardwalk and bridge have all seen incredible progress as well with boards leading out to our community's beautiful water scenery along the Intracoastal Waterway. The Saltwater Wellness Aquatic Center added eye-catching curved poolside walls, adding unique character to the design elements.
-
September 2021
September 2021
As Fall approaches, our community continues to come together. Check out these wonderful drone photos to see how the community is taking shape during the month of September. The boardwalk is ready and waiting for you to take a morning stroll to catch the sunrise, while roads are literally being made to take you to your dream coastal community.
September 2021
As Fall approaches, our community continues to come together. Check out these wonderful drone photos to see how the community is taking shape during the month of September. The boardwalk is ready and waiting for you to take a morning stroll to catch the sunrise, while roads are literally being made to take you to your dream coastal community.
-
December 2021
December 2021
As we approached the end of 2021 here at Trinity Landing, construction began for our highly anticipated addition of Villas 2, 3 and 4 (an early launch of our Phase 2 development, due to high demand)! We’re almost ready to have you join us at one of our thoughtfully designed restaurants and enjoy a cocktail at the sunken bar inside Portside Pub! We’ve been hard at work preparing for all of the excitement to come in the new year as we look forward to officially opening our doors and welcoming our new residents in May 2022.
December 2021
As we approached the end of 2021 here at Trinity Landing, construction began for our highly anticipated addition of Villas 2, 3 and 4 (an early launch of our Phase 2 development, due to high demand)! We’re almost ready to have you join us at one of our thoughtfully designed restaurants and enjoy a cocktail at the sunken bar inside Portside Pub! We’ve been hard at work preparing for all of the excitement to come in the new year as we look forward to officially opening our doors and welcoming our new residents in May 2022.
-
March 2022
December 2021
As we approached the end of 2021 here at Trinity Landing, construction began for our highly anticipated addition of Villas 2, 3 and 4 (an early launch of our Phase 2 development, due to high demand)! We’re almost ready to have you join us at one of our thoughtfully designed restaurants and enjoy a cocktail at the sunken bar inside Portside Pub! We’ve been hard at work preparing for all of the excitement to come in the new year as we look forward to officially opening our doors and welcoming our new residents in May 2022.
April 2022
All the amenities you could want, right at your fingertips. That’s what you’ll have as a resident of Trinity Landing. Whether you are looking to exercise your mind or body, we have you covered as the final touches are taking place in the Fitness Center, Wellness Studio, Chart House Library and Seascape Spa. Show off that competitive side on our Pickleball Courts! We haven’t forgotten about your furry friends, our dog park is the perfect spot to let them meet new friends as well!
-
June 2022
December 2021
As we approached the end of 2021 here at Trinity Landing, construction began for our highly anticipated addition of Villas 2, 3 and 4 (an early launch of our Phase 2 development, due to high demand)! We’re almost ready to have you join us at one of our thoughtfully designed restaurants and enjoy a cocktail at the sunken bar inside Portside Pub! We’ve been hard at work preparing for all of the excitement to come in the new year as we look forward to officially opening our doors and welcoming our new residents in May 2022.
June 2022
Our beautiful courtyards are ready and waiting for you to enjoy a lovely evening with new friends here at Trinity Landing. As you can see, things are in the home stretch as final touches are being made throughout the community. Charging stations have been installed and are ready for your electric vehicles. And as one group of Villas are finalized, the next ones begin to take shape. We can’t wait for you to call Trinity Landing home.
-
October 2020
October 2020
We kicked off October with framing of the Town Center, followed shortly by the installation of firewalls in the wings of the Town Center. Structural steel was implemented for the restaurants, allowing us to envision the future Oyster Bay Café, The Jetty Private Dining Room and Marker 1398 Dining Room. We also continued to make progress on our villas throughout October, preparing the structures for slabs.”
October 2020
We kicked off October with framing of the Town Center, followed shortly by the installation of firewalls in the wings of the Town Center. Structural steel was implemented for the restaurants, allowing us to envision the future Oyster Bay Café, The Jetty Private Dining Room and Marker 1398 Dining Room. We also continued to make progress on our villas throughout October, preparing the structures for slabs.”
-
January 2021
January 2021
In January we started seeing what we anticipate being an exciting and popular amenity space for our residents – the Low Tide Pub – truly come to life. Many of our other resident amenity spaces made significant progress including: Oyster Bay Café, Seascape Spa, Chart House Library, Rusty Anchor Club Room, Driftwood Art Studio, Live Oak Auditorium, The Jetty Private Dining Room, Marker 139 Dining Room, the Saltwater Wellness Studio, Fitness Center and Aquatic Center. An emergency backup generator was also installed in January!
January 2021
In January we started seeing what we anticipate being an exciting and popular amenity space for our residents – the Low Tide Pub – truly come to life. Many of our other resident amenity spaces made significant progress including: Oyster Bay Café, Seascape Spa, Chart House Library, Rusty Anchor Club Room, Driftwood Art Studio, Live Oak Auditorium, The Jetty Private Dining Room, Marker 139 Dining Room, the Saltwater Wellness Studio, Fitness Center and Aquatic Center. An emergency backup generator was also installed in January!
-
April 2021
April 2021
Amazing developments were made in April at Trinity Landing! A shotcrete application was laid in the pool and hot tub early on in the month. Boardwalks, bridges and pilings were installed, connecting from our villas to our islands. Construction in the Town Center has made so much progress that we were even able to invite our future residents to join us for a tour of the shared common and amenity spaces, the Wellness Center and restaurants.
April 2021
Amazing developments were made in April at Trinity Landing! A shotcrete application was laid in the pool and hot tub early on in the month. Boardwalks, bridges and pilings were installed, connecting from our villas to our islands. Construction in the Town Center has made so much progress that we were even able to invite our future residents to join us for a tour of the shared common and amenity spaces, the Wellness Center and restaurants.
-
July 2021
July 2021
With July construction, our community continues to take shape. As you can see from these amazing drone photos, our vision of a one of kind, active senior living community on the Intracoastal Waterway is coming to fruition. Beam installation has been completed, making us one step closer to the completion of our state of the art Aquatic Center.
July 2021
With July construction, our community continues to take shape. As you can see from these amazing drone photos, our vision of a one of kind, active senior living community on the Intracoastal Waterway is coming to fruition. Beam installation has been completed, making us one step closer to the completion of our state of the art Aquatic Center.
-
October 2021
October 2021
With landscaping beginning to take place in October, sod has been placed around our beautiful villas. In addition to the wonderful landscaping, roads and walkways are being constructed throughout the community. The waterfront pavilion is almost complete and ready for you to enjoy an evening taking in the amazing natural landscape and priceless views of the Intracoastal Waterway.
October 2021
With landscaping beginning to take place in October, sod has been placed around our beautiful villas. In addition to the wonderful landscaping, roads and walkways are being constructed throughout the community. The waterfront pavilion is almost complete and ready for you to enjoy an evening taking in the amazing natural landscape and priceless views of the Intracoastal Waterway.
-
January 2022
January 2022
There is lots of excitement as we bring in the new year! We are one step closer to the opening of our beautiful new community on the Intracoastal Waterway. The Town Center entrance is almost ready to greet you upon arrival, and the wrap around porch at the Boardwalk Bistro is setting up to be the perfect place to enjoy a bite to eat or a cup of coffee amongst friends. Check out a few of our drone shots to see the community coming to life.
January 2022
There is lots of excitement as we bring in the new year! We are one step closer to the opening of our beautiful new community on the Intracoastal Waterway. The Town Center entrance is almost ready to greet you upon arrival, and the wrap around porch at the Boardwalk Bistro is setting up to be the perfect place to enjoy a bite to eat or a cup of coffee amongst friends. Check out a few of our drone shots to see the community coming to life.
-
April 2022
December 2021
As we approached the end of 2021 here at Trinity Landing, construction began for our highly anticipated addition of Villas 2, 3 and 4 (an early launch of our Phase 2 development, due to high demand)! We’re almost ready to have you join us at one of our thoughtfully designed restaurants and enjoy a cocktail at the sunken bar inside Portside Pub! We’ve been hard at work preparing for all of the excitement to come in the new year as we look forward to officially opening our doors and welcoming our new residents in May 2022.
April 2022
All the amenities you could want, right at your fingertips. That’s what you’ll have as a resident of Trinity Landing. Whether you are looking to exercise your mind or body, we have you covered as the final touches are taking place in the Fitness Center, Wellness Studio, Chart House Library and Seascape Spa. Show off that competitive side on our Pickleball Courts! We haven’t forgotten about your furry friends, our dog park is the perfect spot to let them meet new friends as well!
-
July 2022
December 2021
As we approached the end of 2021 here at Trinity Landing, construction began for our highly anticipated addition of Villas 2, 3 and 4 (an early launch of our Phase 2 development, due to high demand)! We’re almost ready to have you join us at one of our thoughtfully designed restaurants and enjoy a cocktail at the sunken bar inside Portside Pub! We’ve been hard at work preparing for all of the excitement to come in the new year as we look forward to officially opening our doors and welcoming our new residents in May 2022.
July 2022
Finishing touches are taking place as move ins are beginning. Check out these interior photos of the Aquatic Center, Fitness Center, Chart House Library, Live Oak Auditorium and Marker 139 Restaurant. Our waterfront community is ready and waiting for you to call it home!
“Trinity Landing is just what we’ve been waiting for! The timing will be perfect for our active lifestyle right on the Intracoastal.”
—Jerry and Zan Bramley, depositors at Trinity Landing